See my cool aluminum slots there? I got to get them polished up.
February was spent installing the twin stick setup for the transfer case, installing the hydroboost brake system and power steering. Much time spent getting the ps pump pulley lined up with the crankshaft, new bracket later and many shims and success.
No comments:
Post a Comment